1. Confirm the final design A proven and approved design is supplied or confirmed before production begins.
2. Define materials and settings
Materials and manufacturing settings are selected and documented to ensure consistency.
3. Schedule the production run
The batch is scheduled based on quantity, lead time, and current workload.
4. Manufacture the batch
Parts are produced in controlled runs with consistency checks throughout production.
5. Package and ship
Finished parts are packaged together and shipped, with local collection available where applicable.